Showing posts with label disposal. Show all posts
Showing posts with label disposal. Show all posts

Wednesday, 5 December 2018

The brown bin charge is dead! Long live free recycling!

The brown bin recycling charge has been binned in the city of Derby UK!
Turning the tide of charges for garden waste collection which is gradually crippling recycling in the UK
 (as recycling is based on weight and garden waste is a heavy component of any recycling scheme)
 
The Conservative council which was voted into power in the May local election put forward in their election manifesto a return to a free collection.
Prior to this the poor residents of the city had to pay £40 for the service which didn't even last all year!
Back in 2012/13 the council collected almost 20,000 tonnes of garden and food waste which was sent for in vessel composting outside of the city via a free service.
Fast forward to 2017/18 and that tonnage had shrunk to less that 4,400 tonnes of waste composted which was clearly linked to not just the £40 charge but also the fact food waste was no longer accepted and the service was restricted to specific 32 weeks of the year.
 
The charge had devastated the recycling rate at Derby City Council and it is now hoped this will help recycling turn a corner in the city.
 
The return of food waste collections in with the garden waste collection over the full 52 week year takes us back in a positive direction which was previously removed because food waste cannot be processed in a charged for service due to government regulation.
 
Recent residual waste surveys carried out in the city by the council identified that a massive 44% of waste gathered in the cities residual waste bins was garden and food waste.
In 2017/18 the city paid just £31.53 per tonne for its garden waste to be composted in an in vessel process at Ashbourne in Derbyshire.
This compares to the same waste entering the Resource Recovery Solutions residual waste contract where total contract waste costs for 2017/18 were roughly £91.57 per tonne -
a difference of around £60.
A return to a recycling rate of 20,000 tonnes could save the council over £900,000 per year! the council could save a great deal more if it diverted the 44% of compostable garden and food waste from the residual waste bin into the brown composting bin.
Well it could but there is a catch !

Currently the residual waste is sent to be burnt in a D10 disposal gasification incineration plant in Sinfin, Derby.
The council is paying a set fee of £25 million towards the plants construction - which is hopelessly behind schedule.
The less waste that the council sends to that plant the more per tonne fee that becomes when you add the cost to the per tonne charge the council will pay.
The council has contractually agreed to send waste of specific characteristics to be burnt in Sinfin and that includes an agreement to supply waste of a minimum biodegradable content - along with other specific requirements.
The following statement from the brown bin cabinet document shows how the incineration plant contract has its claws into the garden waste recycling project.


Any reduction in biodegradable content sent by the council to the Sinfin Lane plant in Derby will be looked on in a bad way by the operator of the residual waste contract - Resource Recovery Solutions (Derbyshire) or as we know them RRS because in a twist they have been awarded ROCs - Renewable Obligation Certificates for electricity generated from the burning of the biodegradable waste - ROCs have a value and RRS will be able to bank them!
Paying a government bung for burning such waste in an inefficient disposal plant basically rewards FAILURE!

 ©SIMON BACON 2018
 
 
 
 
 

Sunday, 13 November 2016

Dont put it in the recovery position !

It was a simple innocent question that I put to Resource Recovery Solutions at a meeting of the Sinfin waste incineration plants Community Liaison Group (CLG) meeting back in early 2016.
 
We were part way though a presentation by a representative of RRS / SHANKS in relation to what they teach school children they visit at schools across Derby and Derbyshire or tours the construction site with and I was feeling somewhat uneasy that the councils were paying a company that was being employed to burn vast volumes of waste to then also educate school children what we should do with waste.
So at that point I thought hey ho lets just pop a question across to the the RRS / SHANKS  just to satisfy myself that they were in fact educating school children correctly and that I was being unfair to judge them. It was at this point that a representative of RRS / SHANKS (named in the meetings official minutes) told the meeting that they told children it was a recovery plant.
WOW THERE ! WOW THERE ! now hold on just a minute ! did they say it was a RECOVERY PLANT ? really ! a RECOVERY PLANT ?
 
Now burning waste is a funny old game because doing so can be considered to be one of two things when it comes to considering the process in the waste hierarchy it is considered a disposal process unless it can prove otherwise in which case it is a recovery process.

 The waste hierarchy just for clarity is a set of processes when dealing with the whole issue of waste that must be considered as it takes in best practices to deal with waste in the most sustainable way.
It starts with REDUCTION / PREVENTION where the aim is to reduce what waste we produce so managing materials in the best way - by not using them to start with ! Then we have RE-USE which is where whenever possible we take items that are now scrap and attempt to use them again in an innovative way to keep them out of landfill and incineration. Then comes RECYCLE which is when materials at the end of their life if not reused are reprocessed into new items by making use of the products raw material make up. As we head down the hierarchy we get closer to less sustainable methods of waste management such as incineration and landfill - neither of which are good methods of waste disposal. This brings us to RECOVERY which is when those handling waste start to use wastes for energy generation such as in incineration plants which meet an efficiency target called R1. These are plants which can show that their efficiency of energy generation meets a strict target and often requires such plants to export large volumes of heat or steam to customers to meet that efficiency rating. Finally we come to DISPOSAL which includes inefficient energy generation in incineration plants and also landfill.
In a twist to things a plant that meets R1 efficiency targets is STILL a disposal plant until it is granted recovery status.
Now rather conveniently for the UK government they use a waste hierarchy image as shown below which I consider to be incorrect as it blurs the lines between recovery and disposal in the waste hierarchy by using questionable wording.
The image shown below is the image in question and is used by DEFRA in their document
Energy from Waste a Guide to the Debate dated Feb 2014
 
 
Now reviewing the image it would be very easy to be misled into thinking that any incineration plant - including gasification is recovery in the waste hierarchy if it generates energy. The image appears to imply this is the case and as this image is commonly reproduced a gross misunderstanding takes place!
It is only when you take the chance to read other areas of the document that the issue of R1 and its application are considered and at that point you realise the difference between recovery and disposal. Obviously there are some who favour this blurring as it allows them to paint a picture of a project that makes it conveniently sound better than it is.
To aid you readers below is produced a series of statements from DEFRA from the document in relation to R1 and what is known as D10 disposal.
 
Recovery or disposal – the meaning of R1

47. As described above the Waste Framework Directive (WFD) sets out the waste hierarchy and enshrines it in law. It requires that a waste management route defined as recovery should be used ahead of an alternative that is classified as disposal. Exceptions can be made (see below) but this general principle makes it important to know whether a process is considered recovery or disposal. 

48. Historically the Waste Framework Directives have included annexes which set out lists of what are considered to be recovery or disposal operations. Each is given a number and a letter: R for recovery, D for disposal. In the current directive the classifications of particular relevance to energy from waste are: • R1 – Use principally as a fuel or other means to generate energy • D10 – Incineration on land 

49. What this means is that where waste is burnt as a fuel to generate energy it can potentially be considered a recovery operation (R1) but where the purpose of incineration is to get rid of waste, it is considered D10 and hence disposal.  All municipal waste incinerators were and are deemed as disposal activities (D10) unless and until they are shown to meet the requirements of R1. This is why the term R1 often crops up in the debate about how good an energy from waste plant might be and how it compares to other options. 

50. For municipal solid waste, which includes all the waste collected from households, the EU has gone further by defining what it considers to be sufficient for recovery status under R1. The WFD includes a formula relating to the efficiency of the combustion plant. A municipal waste combustion plant can only be considered to be a recovery operation under R1 if it generates energy and the plant meets the efficiency thresholds calculated using the R1 formula

SO THAT IS THE OFFICIAL BLURB FROM DEFRA ON RECOVERY OR DISPOSAL PLANTS AS GOVERNED BY EU DIRECTIVES - WHICH STILL GOVERN THE UK SINCE BREXIT.

So returning to what the RRS / SHANKS representative said they teach students the plant is. they stated they teach students that the plant is a RECOVERY plant - which raises the issue of R1 as noted above.
When we consider R1 and the claims of the RRS / SHANKS representative we know what they are teaching children is false because at the 2nd planning inquiry the developer had to admit that their plant fails the R1 test in its standard mode.
If you tell children something that is false then in general it is usually considered a lie.
It is a lie in this case because staff employed in waste disposal and waste management will know the requirements of the waste hierarchy

 IT IS THEIR JOB.


©SIMON BACON 2016

Wednesday, 1 June 2016

Would you like flies with that?

After a number of years use and ownership by Transcycle - including acting as a hub for the city of Derby's brown bin recycling scheme where garden and food waste was bulked up for shipment to Vital Earth at Ashbourne for composting number 201 Slack Lane in the New Zealand / Mackworth area of the city was placed on the market.
The community have had issues with the site in the past as sited in an inner city area odour and fly issues were always likely to be on residents minds. Few likely noted the small article in the Derby Telegraph in the late summer of 2015 reporting that a new company was moving to Derby from Nottingham and was known as Go 4 Greener Waste Management. Taking on the 2.6 acre site the company owned by Wayne and Sam Turton was described as a business providing a range of recycling services.
Deeds logged with the land registry indicate the Turton's are owners of the site having paid £850,000 in July 2015 with the support of Barclays Bank.
While described in the media at the time as offering recycling services the companies website talks of zero waste to landfill - which to those in anti incineration circles means sending waste to incineration plants in either the UK or Europe. The Go 4 Greener twitter account in the past made reference to agreeing waste disposal contracts with AEB Amsterdam - a major incinerator of waste so it is clear that the company does not just handle specific recyclables but clearly has an interest in waste of a more residual nature - but then that needs to be shipped in some fashion to the likes of AEB Amsterdam. Tweets from 2014 show their engagement with AEB Amsterdam.

This then brings us to the issue that has unfolded in the streets and homes of the Mackworth community in recent weeks and months. While buzzing along under the radar for some time in recent weeks a serious fly outbreak has blighted the community bringing misery and distress to all around including major impacts on the Kingsway Retail Park leading to store closures.
Many pages of the complex story of what has happened and who is to blame have been printed or reported in recent weeks with fingers being pointed in different directions by different parties.
Without a copy of the waste permit it is not possible to identify what the site should and should not handle but what we do know is that the waste permit itself is registered not to Go 4 Greener but to another company owned by the Turton's known as Shows Waste Management which was launched in 2015. Waste permits are the life blood of a waste site - it is what allows the process to take place and these permits are issued by the Environment Agency.
The Turton's via the media appear to be suggesting that the issues relating to the flies on the site and the surrounding area are due to who they call Envirofuels / Trent Valley Recycling who it is claimed they leased part of the site to although the media report that the companies in question deny these claims.
Independent news reporter Derby News recently published an article on the waste saga shedding light on company ownership and the article can be found here
https://derbynews.org.uk/2016/05/27/mackworth-fly-infestation-convenient-confusion-over-whos-to-blame/

The facts with this situation are all pretty murky as to who is responsible for the waste in question but suggestions are circulating that issues with the site were raised at a residents meeting as far back as February 2016 and if this is the case potentially dates back beyond the involvement with these companies. This is backed up by the fact the Environment Agency issued an order against Shows Waste Management on March 10th 2016 which is before Trent Valley Recycling signed the agreement to use the site.
This has led to the site being filled with large bales on the site of what could potentially be refuse derived fuel - known as RDF - shown below.
 
As to what the bales actually contain and their intended destination if they are in fact RDF bales then they could have been produced by either one of the Turton's companies - noting their connections to incineration plants in Holland or that of fledgling company Enviro Fuels Solutions Ltd who appear to be the company the Turton's are referring to.
What is becoming clear is that neither Derby City Council or the Environment Agency are making Shows Waste Management deal with the waste in the time scale locals need to get the fly infestation under control. In recent days a representative of the Environment Agency on East Midlands Today appeared to be implying that in part the issue was linked to homes being built around the site but anyone who knows the area knows that many of the local homes date back decades and in some cases around a century.
The Go 4 Greener website makes some grand claims about the companies ethos so lets hope they stand by them in the coming weeks and deal with the situation that is playing our in the city of Derby.
 
 
There are many unanswered questions in this terrible situation but one that makes you stop and wonder is the following.
 
If you run a waste company and have spent £850,000 on a site and you have an active waste permit in your companies name placing you in the position of overall control and therefore liability why would you risk your business by allowing the serious situation to develop on the site which is now causing such local distress and directly placing your business and family life at risk?
If as suggested in the media there is 5,000 tonnes of waste that needs to be landfilled based just on the landfill tax rate of £84.40 the Turton's face a bill of over £400,000 for disposal of the waste mountain.
 
The latest twist to the saga is that the Environment Agency have started legal action against companies on the site in relation to the waste. How this will pan out is anyone's guess but things need to improve soon for the good of the local community.
 
©SIMON BACON 2016
 
 

 

Wednesday, 20 January 2016

Derby City Council - The public are being robbed! Derby and its unfair share!

With just over a year to go until the Resource Recovery Solutions (RRS) waste gasification incineration plant is completed on the ex tannery site on Sinfin Lane, Sinfin, Derby we find that Derby City Council's thoughts are turning to the payment they will be due to make to their contractor Shanks as their share of the build costs from the joint waste contract with Derbyshire County Council. Due to enter service on April 1st 2017 - no seriously April Fools day the plants construction is well under way with the recent construction of the plants 55 metre high smoke stack that now dominates the local community - even glowing a sinister shade of red at night.
The stack is to the left end of the storage container

The new stack looms over the local bowling alley at night
 
A Derby City Council document submitted for the 20th January 2016 cabinet meeting shows that the council are already lining up their payment of £25 MILLION
 
So that's £25 million to be paid in just over a years time when the plant starts accepting contract waste - the total payment by the councils being £50 million paid as an equal share by both councils.
We know its being paid as an equal share because the waste contract tells us this - in the image below.
Now when paying an equal share in a relationship such as this you would expect the councils to be equal partners. Derby City Council - and so its residents already have to host the controversial waste incineration plant while the county faces none of the controversial issues such a plant brings.
SO IS THIS AN EQUAL PARTNERSHIP?
IT WOULD APPEAR NOT!
The Inter Authority Agreement between the councils sets out issues around what they call the NWTF which is the New Waste Treatment Facility - which is being built on Sinfin Lane. Most of us call it what it is - an incineration plant.
An equal partnership would be a 50/50 split in everything - from the payments the councils are to make through to the plants projected use.
While the councils are indeed paying equal shares do they get equal benefit?
 
Paying 50% of the council payment towards the build cost of the plant - £25 million should allow Derby City Council to send 50% of the waste to the 190,000 tonne a year plant.
BUT!
Derby City Council DOES NOT collect 95,000 tonnes of residual waste! 
DEFRA waste findings published in December 2015 for the year 2014/15 highlight that the city council collected 114,800 tonnes of waste BUT after recycling is taken into account it only collected 79,320 tonnes of residual waste! leaving the council over 15,600 tonnes short!
 
So why are Derby City Council and its residents getting the raw deal here!
PAY 50% OF THE BUILD CHARGE WITHOUT THE SAME BENEFITS OF YOUR PARTNER!
Once again the residents of Derby are being short changed - and at the agreement of their council! 
 
©SIMON BACON 2016
 
 
 
 
 

Sunday, 14 June 2015

Fifty shades of greenwash !

When you think of a green investment bank you think of err a bank that is green that invests in green energy such as wind, solar and tidal power or innovative waste recycling technology. You don't think of a green bank investing in waste incineration which in many cases sits at the bottom of the waste hierarchy!
BUT!
 
that is exactly the case playing out here in Derby UK where the UK Green Investment Bank are funding an ENERGOS waste incineration plant being constructed in an area of poor health in the city and a plant subject to mass objection by local people across not one but two public inquiries. The project is defined as an incineration plant as covered in my previous blog post http://derby-waste-a-rubbish-blog.blogspot.co.uk/2015/04/burn-baby-burn.html
Funding to the tune of £64 MILLION has been secured by the developer SHANKS from the UK Green Investment Bank - often referred to as GIB for their project to burn the waste of Derby and Derbyshire.
What was exposed at the 2nd public inquiry into the Sinfin Lane project was that in its standard electricity only mode the plant would fail to meet the requirements of the R1 formula - which is a test of plant efficiency and by failing to meet the R1 standard the plant would be classed as a D10 disposal plant which sits in the disposal section of the waste hierarchy - or to give it its other name - the bottom of the hierarchy. SHANKS the company proposing the plants construction as part of a long term waste deal to dispose of the waste of Derby and Derbyshire have never put forward a customer for the large volume of heat and steam that the plant will generate as a bi-product of its disposal process.
The Green Investment Bank were quick to trumpet their funding proposal in a press release in August 2014 talking of a plant that would recycle 35,000 tonnes of materials and divert 170,000 tonnes from landfill of the 190,000 tonnes the plant will accept yearly. The 35,000 tonnes of materials recycled is at odds with the claimed recycling rate for the plant and must include the bottom ash being used in construction to get anywhere near that claimed by GIB and in relation to landfill diversion a percentage of the tonnage weight will be lost by natural drying processes which could be attained by pre treatment before landfill.
GIB also refer to the remaining waste being used to generate renewable energy in a statement by Shaun Kingsbury who is the chief executive of GIB. The elephant in the room with such a statement is that the GIB's own website defines such energy as coming from biogenic material but in the case of the Sinfin, Derby plant the mixed waste cannot be considered fully biogenic - because it contains plastics and other none biogenic feedstock. That's before we even consider if burning biogenic material is actually renewable! can it be if we have no control in relation to the replacement of such biogenic materials?
Further to this by providing funding for the Derby waste incineration plant GIB are supporting the burning of waste that could be recycled because the councils have signed up to a contract requiring them to procure waste of specific forms including tonnage, calorific, biodegradable and moisture content.
The Green Investment Bank has been challenged on a number of their claims - talk about fifty shades of green !
I await their reply !

©SIMON BACON 2016


Sunday, 8 March 2015

Bins on streets - Section 46 can help !

One of the most important waste related things we all need as residents is a successful waste disposal system that manages waste sustainably. A disposal system needs to be easy to understand and simple to take part in when we as residents are expected to recycle our waste - as we should do. We create the waste so it is only right that we dispose of it safely and correctly. The trouble is some of us either don't understand the process of waste disposal - recycling being a prime example or we don't want to take part at all - we just like to consume and dump, consume and dump day in day out.
If people don't understand the concept of recycling or simply don't care this can cause a number of issues. It can lead to bins being left unemptied if they contain items that should not be there. It can lead to lower value recyclate being gathered which may not impact on our council at first but long term can impact on values nationally and any falling price in recycling is a bad place to be because in the end that fall in prices finds its way back to the council via higher gate fees etc.

Where bins are left on streets - be it a contaminated recycling bin, an empty recycling bin or simply just a residual waste bin this situation drags a community down. A street full of bins degrades a community causing a blight by blocking pavements, attracting side waste and fly tipping, all aspects we don't want to experience as residents in our community. This is a very common issue in Derby in a number of wards including Normanton, Arboretum and Abbey to name just three. Sometimes residents have legitimate reasons for leaving bins on the streets such as lack of access to a rear garden. Sometimes the street is the only place for the bin in such cases but the council needs to confirm this is actually the case and not simply a lazy excuse. The council should also work to address access issues where possible - for example by clearing blocked alleyways or reviewing issues such as rights of access issues where a resident has blocked the ability of others to access properties from the rear by building fencing or planting hedging.
There is one government act known as the Environmental Protection Act 1990 which gives councils the power if they choose to make residents remove bins from the street outside set collection periods. Section 46 of the act which focuses on household waste collection gives councils the power to set out times when it is acceptable to place bins on the street and allows for action to be taken if bins are in place outside this period. For Some reason Derby City Council are not using that ability and so the streets of Normanton, Arboretum, Abbey, Mackworth and other wards are left with streets full of bins which leads to recycling bin contamination and fly tipping.
Is there a political will in Derby to use such powers or do those in power favour a cluttered street scene over making the electorate take responsibility for their waste disposal bins.

©SIMON BACON 2016